PUBLIC WORKS CONTRACTS (CONSTRUCTION) | |||||
Contract Number | Title | Int. Projected Advertisement | Rev. Projected Advertisement | Contact | Est. Value |
15NL-140 | Coliseum Station Elevator Modernization | Nov 2021 | Jun 2024 | $5-$8M | |
15TC-182 | Train Control Room Repairs Water Intrusion Mitigation | Feb 2023 | TBD | $4.5M | |
03QJ-110A | Concord Yard Wheel Truing Facility | Dec 2023 | May 2024 | $37M | |
47CJ-140A | Installation of Fare Gates | Feb 2024 | May 2024 | $5M | |
15CQ-211B | Direct Fixation Fastener Assembly Procurement | Feb 2024 | TBD | $3M | |
15TC-101 | M Line Tunnel Water Intrusion Mitigation | Apr 2024 | May 2024 | $25M-$30M |
Future Construction Contracts Through 2024
*DISCLAIMER: The information provided below is preliminary and subject to change. Bidders shall not rely on this information below in preparing any bid submittals. Information provided cannot be relied upon for activities including but not limited to design, construction, and construction management purposes. The District will not provide any additional information or any inquiries until these contracts are advertised.
Project Name | Contract Description | Estimated Construction Cost |
Millbrae Tail Tracks ‐ Phase 2 | Work includes but is not limited to the construction of retaining walls, drainage, etc. in support of extending tail tracks at Millbrae. | $7‐$10M |
Station Fire Alarm Replacement‐Phase 4 | Work includes but is not limited to the furnishing, installation, testing and commissioning of station fire alarm replacements at the following locations: Phase 4 ‐ El Cerrito Plaza (R40), Bay Fair (A50), South Hayward (A70), Rockridge (C10) and Concord (C60). | $4‐$7M |
Pittsburgh‐Bay Point Elevator Renewal | Work includes but is not limited to the modernization of elevators at the Pittsburg Bay Point station, including Installation, replacement, or upgrade of selected electrical and mechanical components. | $3‐$6M |
Met G Generator Replace, 1250 KW | Work includes but is not limited to the furnishing, installation, testing, and commissioning of a 1250 kW Generator (with associated infrastructure) at Lake Merritt (LMA) street level, to replace the existing 400 kW Met Building (METG) rooftop generator. Infrastructure and services include electrical, mechanical, architectural, structural, civil, systems, control and communications components. | $5‐$10M |
LMA HVAC Renovation | Work includes but is not limited to the replacement of the 50‐year‐old HVAC system that serves the Lake Merritt (LMA) complex including the Operations Control Center (OCC) and computer rooms. | $10‐$15M |
TCCP EB TPSS Procure & Install | Work includes but is not limited to the installation and construction of three new substations in Moraga, Oakland, and Richmond. | $80‐$95M |
Control Tower HVAC (OCY, ORY) | Work includes but is not limited to the replacement and upgrade of HVAC equipment servicing the Concord and Richmond Yard control towers. | $1‐$5M |
REPLACE SEWAGE PUMPS | Work includes but is not limited to the replacement of sewage pumps at 32 locations, including stations and yards. The original pumps are past their expected service life and require frequent, unexpected maintenance. | $1‐$3M |
Upgrade Fire Suppression Systems | Work includes but is not limited to the replacement of all sprinkler heads in stations approaching 50 years in age (13 sites all‐inclusive) at underground San Francisco stations and underground East Bay stations. | $1‐$5M |
Embarcadero Platform Elevator | Work includes but is not limited to the renovation of the existing Embarcadero Platform hydraulic elevator, with a new elevator machine room and new stairs at the south side of the station including stair foundation and structure, mechanical, electrical, communications, architectural finishes, signage, equipment installation, testing, and commissioning and other work as indicated in the Contract Drawings. | $10‐$15M |
Stabilize MW‐12 Slope | Work includes but is not limited to the MW‐12 North Slope by regrading slope, installation of turf reinforcement mat, launched soil nails, removal and replacement of storm structures, including but not limited to storm drain inlets, valley gutter, concrete outfall, drainpipes, and rock slope protection. | $5‐$10M |
Replace Hydraulic Lift Cylinders at Hayward and Richmond Shops | Work includes but is not limited to the replacement of hydraulic truck lift cylinders at Richmond, Hayward, Daly City, and Concord Shops. | $1‐$3M |
MATERIALS, EQUIPMENT & SUPPLIES | ||||
IFB Number | Title | Int. Projected Advertisement | Contact | Est. Value |
IFB 9139 | Stake Truck with 3rd Axle and Liftgate (Diesel) | TBD | $812K |
PROFESSIONAL AND OTHER SERVICES (SERVICES) | |||||
Contract Number | Title | Int. Projected Advertisement | Rev.Projected Advertisement | Contact | Est. Value |
6M4852 | Affordable Housing Revolving Loan Program | TBD | TBD | Revenue Generating | |
6M4862 | Administration On-Call Professional Consulting | Mar 2024 | TBD | $1.5M | |
6M2099 | Financial On-Call Professional Services | Apr 2024 | TBD | $2M | |
6M4874-77 | Independent Medical Examinations | May 2024 | TBD | $300K |
MICRO SMALL BUSINESS ENTITY (MSBE) SET-ASIDE CONTRACTS/AGREEMENTS | |||||
Contract Number | Title | Int. Projected Advertisement | Rev. Projected Advertisement | Contact | Est. Value |