Service reduced to one track through the Transbay Tube this Sunday, July 19, for essential lighting work. Trains will run every 30 minutes systemwide. No Green and Red line service.
In order to relieve ferry traffic on the bay, ideas for a transbay tube come as early as 1920. Instead, the Bay Bridge is built with rail tracks in 1936.