Out for Bid


New Procurement Portal Now Available
BART has a new procurement portal. All existing and prospective bidders, proposers, vendors, contractors and suppliers must register in the new system to receive information about ongoing procurement activity. In the coming weeks, BART will begin posting solicitations in this new system. You will only be able to access this information in the procurement portal. Sign up today.
 


Professional and Other Services (Services)

 

AGREEMENT NUMBER:  6M3371
TITLE: Graffiti Removal Services Districtwide
PRE-PROPOSAL MEETING:  June 2, 2017
PROPOSALS DUE DATE: July 11, 2017
SUMMARY OF SCOPE:  Provide graffiti removal services Districtwide for the East Bay and West Bay locations. 
INVITATION TO PROPOSERS: (MS Word 2003)
CONTACT: salva@bart.gov


Public Works Contracts (Construction)

 

CONTRACT NUMBER:  09AF-111
TITLE: TBT Cross Passage Doors Replacement
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): March 15, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: April 12, 2017
REQUEST FOR 3RD PARTY NON-DISCLOSURE AGREEMENT: March 15, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: May 8, 2017
PRE-BID MEETING/SITE INSPECTION:  TBD
BIDS DUE DATE: June 27, 2017
ESTIMATED COST: $4,500,000 to $5,500,000
SUMMARY OF SCOPE:  Provide removal and replacement of all exiting Transbay Tube (TBT) cross passage doors and the transition structures access doors to TBT. It is to provide all operations necessary to replace One Hundred Fourteen (114) TBT cross passage doors and six (6) additional doors in the Oakland and San Francisco transition structures accessing to TBT, for a total of 120 doors.
INVITATION TO BIDDERS: (MS Word 2003) 09AF-111, W-9
CONTACT: gabdull@bart.gov

 

CONTRACT NUMBER:  15TH-120
TITLE: Water Intrusion Repair at Train Control Rooms
PRE-BID MEETING/SITE INSPECTION:  May 16, 2017
BIDS DUE DATE: June 27, 2017
ESTIMATED COST: $780,000 to $830,000
SUMMARY OF SCOPE: Furnishing all labor, equipment, materials and services required to remove and replace roofing at Daly City Station, Fruitvale Station, and San Leandro Station train control rooms and install a waterproofing membrane in the trackway over the Daly City train control room.
INVITATION TO BIDDERS: (MS Word 2003) 15TH-120, Addendum
CONTACT: LberryL@bart.gov

 

CONTRACT NUMBER:  09EK-130A
TITLE: Oakland Emergency Generator (OEG) System
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): June 12, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: June 26, 2017
REQUEST FOR 3RD PARTY NON-DISCLOSURE AGREEMENT: June 12, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: July 10, 2017
PRE-BID MEETING/SITE INSPECTION:  TBD
BIDS DUE DATE: September 12, 2017
ESTIMATED COST: $19,000,000 to $22,000,000
SUMMARY OF SCOPE:  Provide all labor, material, equipment, management, coordination to provide a 4.16kV, 2.5MW emergency generator system along with associated 4160V switchgear and 480V switchgear/switchboard lineup along with the required transformers grounding, and improvements to mechanical and civil/structural facilities such as deep soil ground improvements and structural pipe piles or deep soil mix ground improvement including automated monitoring and controls systems to operate the generator and the electrical system as well as infrastructure for utility power to site. The project shall provide power for all emergency loads such as ventilation fans, fire pumps, drain pumps, lighting and other necessary loads during an emergency condition when existing utility power is not available. The work will include communication systems needed for BART interface (such as CCTV, SCADA, ACP, FAT and systems integration).
INVITATION TO BIDDERS: (MS Word 2003) 09EK-130A 
CONTACT: sgunawa@bart.gov


Materials, Equipment and Supplies (Procurement)

 

CONTRACT NUMBER:  49GH-110
TITLE: RFQ/P for the Design Build of A Communications Based Train Control (CBTC) System
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): April 11, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: May 23, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: November 7, 2017
PRE-SUBMITTAL CONFERENCE:   TBD in July 2017
QUALIFICATIONS DUE DATE: August 15, 2017
ESTIMATED COST: $500,000,000 to $625,000,000
SUMMARY OF SCOPE:  The Design-Build Contract Work consists of furnishing all management and technical services including coordination, professional services, labor, equipment, materials, safety certification, training, spare parts, and other services to perform the design, manufacture, installation, testing and commissioning and handover of the turnkey communications based train control system for BART. The Work includes related vehicle, wayside, communications and Automated Train Supervision (ATS) systems work.
INVITATION TO PROPOSE: (MS Word 2003) 49GH-110, Attachment 1, Attachment 2, W-9 , Addendum #1, Prime NDA.pdf, Third Party NDA.pdf
CONTACT: igray@bart.gov