Public Works Contracts (Construction)
CONTRACT NUMBER: 15EI-120A
TITLE: Substation WSS and CCO 345kV Transformer Upgrade and Replacement
PRE-BID MEETING: March 2, 2010
BIDS DUE DATE: March 23, 2010
ESTIMATED COST: Between $1,000,000 to $1,500,000
SUMMARY OF SCOPE: Provide all labor, materials, components, hardware, equipment and services necessary to disconnect, remove and dispose of the existing 4 MW damaged cast-coil transformer X01 at the BART South San Francisco Substation (WSS); remove and safely dispose of all the debris including the damaged transformer components, damaged wiring and associated damaged equipment for the jobsite; also disconnect and remove the existing 4MW cast-coil transformer X02 from WSS; furnish two (2) new natural ester oil-filled transformers and perform factory tests; disconnect, remove and dispose of existing 5 MW damaged cast-coil transformers at CCO and abandoned rectifier at Galindo Drive Substation (CGD); test and commission the transformers into BART revenue service.
INVITATION TO BIDDERS: (Microsoft XP): 15EI-120A
CONTACT: igray@bart.gov
CONTRACT NUMBER: 15PQ-110
TITLE: BART Earthquake Safety Program, Station Structure-C Line, Concord Station
PRE-BID MEETING: February 24, 2010
BIDS DUE DATE: March 30, 2010
ESTIMATED COST: Between $1,500,000 to $2,000,000
SUMMARY OF SCOPE: Provide concrete overlay of existing pile caps; concrete infill walls; concrete jacketing of existing bent columns; shear key construction and thickening of existing concrete bent caps; drilling, grouting of dowels and rods into existing pile caps, foundations and bent caps; reinforcing of existing platform canopy framings; and construction of all related sitework, architectural, electrical and mechanical elements including asbestos and lead paint abatement.
INVITATION TO BIDDERS: (Microsoft XP): 15PQ-110, Addendum
CONTACT: gary.leong@bart.gov
CONTRACT NUMBER: 15PL-110
TITLE: BART Earthquake Safety Program Yard Shops and Miscellaneous Structures
PRE-BID MEETING: February 26, 2010
BIDS DUE DATE: March 30, 2010
ESTIMATED COST: Between $19,000,000 to $23,000,000
SUMMARY OF SCOPE: Provide structural retrofit of steel, concrete and wood structures; demolition and restoration of architectural, mechanical, electrical and plumbing components and systems; demolition of selected existing concrete foundations, buttress walls, construction of new concrete foundations; drilled concrete piers and shafts; provision of temporary construction facilities for BART employees and construction of the new Concord Car Cleaner’s Building.
INVITATION TO BIDDERS: (Microsoft XP): 15PL-110
CONTACT: sgunawa@bart.gov
CONTRACT NUMBER: 15PN-110
TITLE: BART Earthquake Safety Program Systemwide Equipment Retrofit
PRE-BID MEETING: February 25, 2010
BIDS DUE DATE: April 6, 2010
ESTIMATED COST: Between $10,500,000 to $16,500,000
SUMMARY OF SCOPE: Construction of anchorage modifications to the existing systemwide equipment to provide adequate resistance to forces of a major seismic event.
INVITATION TO BIDDERS: (Microsoft XP): 15PN-110, Addendum
CONTACT: igray@bart.gov
CONTRACT NUMBER: 15IC-110
TITLE: 48VDC Station UPS Replacement
PRE-BID MEETING: March 18, 2010
BIDS DUE DATE: April 6, 2010
ESTIMATED COST: Between $650,000 to $735,000
SUMMARY OF SCOPE: Provide all labor, materials, equipment and services to replace, upgrade and increase capacity to 48 VDC Systems in all the legacy stations and yards.
INVITATION TO BIDDERS: (Microsoft XP): 15IC-110
CONTACT: sgunawa@bart.gov
Professional and Other Services (Services)
NONE TO REPORT.
Materials, Equipment and Supplies (Procurement)
CONTRACT NUMBER: 40FA-110
TITLE: Procurement of Transit Vehicles
PRE-PROPOSAL MEETING: October 12, 2009
PROPOSALS DUE DATE: June 29, 2010
ESTIMATED COST: TBD
SUMMARY OF SCOPE: Provide design, engineering, mock-ups, manufacture, assembly, testing, delivery, materials, tools, equipment, performance and acceptance testing for 200 new heavy rail transit vehicles (“Vehicles”), ready for revenue service as an integral part of the District’s transportation system, and associated program management, in-service support, publications, warranty, training and data, two (2) Options of 250 Vehicles each, two (2) Options of 75 Vehicles each, and one (1) Option of 150 Vehicles, subject to the availability of funding.
INVITATION TO PROPOSERS: (Microsoft XP): 40FA-110, Order Form, Addendum
CONTACT: igray@bart.gov