PUBLIC WORKS CONTRACTS (CONSTRUCTION) | ||||
Contract Number | Title | Projected Advertisement | Contact | Est. Value |
17HM-110 | Met-G Generator Replacement | TBD | $9M - $10M | |
15CQ-211B | Procurement of Direct Fixation Fastener Assembly | TBD | $2.5M - $3M | |
15NL-140 | Coliseum Station Elevator Modernization | May 2026 | $7M | |
15TC-206 | East Bay, Berkeley and Oakland Street Grating Rehabilitation | Apr 2026 | $3M | |
Future Construction Contracts Through 2026
*DISCLAIMER: The information provided below is preliminary and subject to change. Bidders shall not rely on this information below in preparing any bid submittals. Information provided cannot be relied upon for activities including but not limited to design, construction, and construction management purposes. The District will not provide any additional information or any inquiries until these contracts are advertised.
Project Name | Contract Description | Estimated Construction Cost |
MacArthur Underpass Lighting Improvement | Lighting improvements including but not limited to demolition of existing underpass lighting mounted on the walls and new lighting installation. Coordination with various external stakeholders, including City of Oakland, CalTrans, Emery Go Round, and AC Transit will be required. | $2.6M |
TBT CP Anode Sled and Cable Replacement | *SSI Project* Work includes but is not limited to replacement of anode array assemblies and anode cables that are inoperable or have reached the end of their useful life. | $4.8M |
Embarcadero Platform Elevator Modernization and South Stairs Widening Project | Work includes but is not limited to modernization of the existing hydraulic elevator, construction of a new elevator machine room and south-side stairs, and associated structural, mechanical, electrical, and communications work. | $12.5M |
Coliseum Station Elevator Modernization | Work includes but is not limited to renewal/modernization of elevators at Coliseum Station. | $7.1M |
Pittsburg/Bay Point Elevator Renewal | Work includes but is not limited to renewal/modernization of elevators at Pittsburg/Bay Point Station. | $6.4M |
LAKE MERRITT ADMINISTRATION (LMA) HVAC UPGRADE | Work includes but is not limited to replacement of HVAC system that serves the Lake Merrit Administration complex. | $18.6M |
Dublin/Pleasanton Access Improvements | Work includes but is not limited to access improvements to Dublin/Pleasanton Station for pedestrians, bicyclists, and transit passengers. Increase connectivity to the Iron Horse Trail. | $10.9M |
Pittsburg Bay Point Access Improvements | Work includes but is not limited to access improvements to Pittsburg Bay Point Station for pedestrians, bicyclists, and transit passengers. | $3M |
Water Intrusion Train Control Package 3 | Work includes but is not limited to repair of water intrusion in the train control rooms in various stations | $3.4M |
MET G Generator Replacement | Work includes but is not limited to supply and installation of 1.25MW Generator and its sound enclosure structure at BART Lake Merrit Complex (LMA). | $10.1M |
HMC2 East Storage Yard | Work includes but is not limited to construction of a storage yard to house BART revenue vehicles and provide a means to egress to A1 and A2 mainline tracks. Additionally, scope consists of, but is not limited to, civil, utilities, structures, trackwork, traction power, train control, communications and electrical improvements to the Hayward Rail Storage Yard (HRY). | $190M |
A-Line 34.5kV AC Cable Replacement | Work includes but is not limited to replacement of 34.5KV AC Cable along A0-Line. | $20M |
K Line Interlocking Replacement | Work includes but is not limited to construction related to replacement of turnouts at interlockings at Macarthur, upgrade of District infrastructure on the K line at the MacArthur (K23, K25) interlockings, including, but not limited to, Track, Train Control and Traction Power components. | $65M |
MATERIALS, EQUIPMENT & SUPPLIES | ||||
IFB Number | Title | Projected Advertisement | Contact | Est. Value |
IFB 9149 | Portable Hydraulic Rerailing Equipment | TBD | $280K | |
IFB 9151 | MUX Conductor Cable | TBD | $240K | |
IFB 9152 | Diesel Stake Truck Tractor with 5TH Wheel | TBD | $201K | |
PROFESSIONAL AND OTHER SERVICES (SERVICES) | ||||
Contract Number | Title | Projected Advertisement | Contact | Est. Value |
6M8215 | Construction Management Services | 2nd Quarter 2026 | $135M | |
6M2125 | Bond Underwriting Services | Apr 2026 | Revenue - Generating | |
MICRO SMALL BUSINESS ENTITY (MSBE) SET-ASIDE CONTRACTS/AGREEMENTS | ||||
Contract Number | Title | Projected Advertisement | Contact | Est. Value |