OAC Vehicle Installation


OAC Guideway Installed Above Northbound Interstate 880 at Hegenberger Road

Click Here to view a video of the guideway installation

 

Past Project Update Videos

September 2013 (Raw Footage)
June 2013 (Raw Footage)
March 2013 (Raw Footage)
December 2012 (Raw Footage)

Back to Top of Page 

 

Construction Notification 44: Traffic Signal Work on Hegenberger Road at Pardee Drive and Edgewater Drive

Start Date

April 1, 2014

Summary of Activity

 

Daytime work on traffic signals will require the use of flashing red lights or stop signs at intersections along Hegenberger Road.

Impacts

  • Daytime signal outage at several intersections along Hegenberger Road
  • Flashing lights or stop signs will be used to manage traffic flow at intersections
  • Traffic delays are possible

View the notification

Construction Notification 43: Vehicle Testing to Begin on Oakland Airport Connector Guideway Tracks

Start Date

Late January 2014

Summary of Activity

Project will begin testing vehicles on the elevated guideway between BART Coliseum Station and the Oakland Inernational Airport.

Impacts

  • Vehicles will be seen traversing guideway structure, however it will not be open for service during testing.

View the notification

Back to Top of Page

Construction Notification 39: Coliseum Station Transition Building Ongoing Construction

Start Date

Ongoing

Summary of Activity

Construction of the Coliseum Station Transition Building at the Coliseum/Oakland Airport BART station.

Impacts

  • Lane reconfigurations, closures and shifting of traffic
  • Large equipment and materials being transported and installed overhead
  • Construction-related noise, dust and vibration

View the notification

Back to Top of Page

 

 

Notification Archive

Choose a notification below for full details.

Notification 42: Nighttime Closures of San Leandro Street

Notification 41: Nighttime Closures of 98th Avenue for Guideway Truss Installation

Notification 40: Hegenberger Road Lane Closures and Interstate 880 Lane and Ramp Closures at Hegenberger Road

Notification 38: Guideway Installation at the Intersection of Hegenberger Road, Airport Access Road and Pardee Drive

Notification 37: Guideway Installation and Southbound Interstate 880 Highway Closures at Hegenberger Road

Notification 36: Guideway Installation and Northbound Interstate 880 Highway Closures at Hegenberger Road

Notification 35: Continued Construction in 2013

Notification 34: Banner Sign Installation

Notification 33: Nighttime Closures of Southbound Hegenberger Road at Southbound Interstate 880 Off-Ramp

Notification 32: Nighttime Closures of Southbound Hegenberger Road at Coliseum Way/Edes Avenue and Interstate 880 On-Ramps

Notification 31: Continued Guideway Truss Installation Along Hegenberger Road Between San Leandro Street and Airport Access Road/Pardee Drive

Notification 30: Traffic Switch and No Left Turn at Doolittle Drive at Airport Access Road

Notification 29: Nighttime Closure of Southbound Hegenberger Road from Hawley Street to Baldwin Street

Notification 28: June 2012 Construction Update

Notification 27: Coliseum Station Transition Building Start of Construction

Notification 26: Guideway Truss Installation along Hegenberger Road between Hegenberger Loop and Airport Access Road/Pardee Drive

Notification 25: Guideway Foundation and Column Construction Along Interstate 880 North of Hegenberger Road and Hegenberger Road On- and Off- Ramps

Notification 24: Continued Tunnel Construction at the Intersection of Airport Access Road and Doolittle Drive

Notification 23: Guideway Foundation and Column Construction along Hegenberger Road between Interstate 880 and Hegenberger Loop

Notification 22: May 2012 Construction Update

Notification 21: Road Reconfiguration and Guideway Foundation Construction along Hegenberger Road between San Leandro Street and Interstate 880

Notification 20: Guideway Foundation Construction at the Intersection of Hegenberger Road and Airport Access Road and along 98th Avenue

Notification 19: Continued Construction in 2012

Notification 18: Continued Guideway Foundation Construction

Notification 17: Guideway Foundation Construction

Notification 16: Hegenberger Road Reconfiguration (North)

Notification 15: Hegenberger Road Reconfiguration (South)

Notification 14: Utility Relocation Work

Notification 13: Station and Guideway Foundation Construction

Notification 10: Guideway Foundation Construction (Revised)

Notification 9: Utility Relocation for Subway Construction

Notification 8: Utility Relocation Work at the Intersection of Hegenberger Road, Airport Access Road
and Pardee Drive

Notification 7: Utility Relocation Work on Hegenberger Road

Notification 6: Guideway Foundation Construction

Notification 5: Pile Driving and Start of Station and Guideway Construction

Notification 4: Pile Driving and Start of Maintenance & Storage Facility Construction

Notification 3: Utility Relocation Work (Revised)

Notification 2: Start of Soil Investigation Work

Notification 1: Oakland Airport Connector Project to Begin

Demolition of BART Teamsters Union Building (Revised)

Back to Top of Page

 

 