Out for Bid


New Procurement Portal Now Available
BART has a new procurement portal. All existing and prospective bidders, proposers, vendors, contractors and suppliers must register in the new system to receive information about ongoing procurement activity. In the coming weeks, BART will begin posting solicitations in this new system. You will only be able to access this information in the procurement portal. Sign up today.
 


Professional and Other Services (Services)

 

NONE TO REPORT


Public Works Contracts (Construction)

 

CONTRACT NUMBER:  11OG-121
TITLE: Balboa Park Station Wayfinding Improvements
PRE-BID MEETING/SITE INSPECTION:  April 4, 2017
BIDS DUE DATE: May 23, 2017
ESTIMATED COST: $950,000 to $1,000,000
SUMMARY OF SCOPE:  Provide all equipment, tools, materials, labor, management, coordination, professional services and other services required to complete wayfinding improvements to the Balboa Park Station site including electrical, communications, structural design, and construction. Removal of selected existing signage and restoration of existing finishes where signage is removed, lead paint and asbestos inspection and abatement in connection with removal of signs and installation of wayfinding improvements.
INVITATION TO BIDDERS: (MS Word 2003) 11OG-121Add.doc
CONTACT: LberryL@bart.gov

 

CONTRACT NUMBER:  15PJ-130B
TITLE: BART Earthquake Safety Program Fruitvale Station and Coliseum Station
PRE-BID MEETING/SITE INSPECTION:  May 8, 2017
BIDS DUE DATE: June 6, 2017
ESTIMATED COST: $14,000,000 to $15,500,000
SUMMARY OF SCOPE:  Provide all equipment, tools, materials, labor, management, coordination, professional services and other services required to construct structural retrofit of the Fruitvale station and Coliseum station including structural retrofit of pier foundations, columns and pier caps; demolition of selected existing facilities; shoring for excavation support; excavation; steel and concrete structure retrofit at girders and stairs; drilling and bonding dowels in concrete; electrical work at piers and the main concourse, defined as the covered area between station entrances; architectural work at stairs and curtain walls, retrofit of escalator trusses, restoration of paving, stripping, sidewalks, utilities.
INVITATION TO BIDDERS: (MS Word 2003) 15PJ-130B
CONTACT: LberryL@bart.gov

 

CONTRACT NUMBER:  09AF-111
TITLE: TBT Cross Passage Doors Replacement
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): March 15, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: April 12, 2017
REQUEST FOR 3RD PARTY NON-DISCLOSURE AGREEMENT: March 15, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: May 8, 2017
PRE-BID MEETING/SITE INSPECTION:  TBD
BIDS DUE DATE: June 6, 2017
ESTIMATED COST: $4,500,000 to $5,500,000
SUMMARY OF SCOPE:  Provide removal and replacement of all exiting Transbay Tube (TBT) cross passage doors and the transition structures access doors to TBT. It is to provide all operations necessary to replace One Hundred Fourteen (114) TBT cross passage doors and six (6) additional doors in the Oakland and San Francisco transition structures accessing to TBT, for a total of 120 doors.
INVITATION TO BIDDERS: (MS Word 2003) 09AF-111, W-9
CONTACT: gabdull@bart.gov

 

CONTRACT NUMBER:  11KH-110A
TITLE: 24th and Mission Station Crossover Facilities Improvements
PRE-BID MEETING/SITE INSPECTION:  May 11, 2017
BIDS DUE DATE: June 13, 2017
ESTIMATED COST: $400,000 to $500,000
SUMMARY OF SCOPE:  Provide tenant improvements within the station on the Concourse level and Platform level. Concourse level improvements consist of new train operator breakroom, remodel and upgrade of the existing staff toilet into a combined staff and train operator restroom which shall be fully accessible compliant. Platform level improvements consist of adding a prefabricated supervision booth including all associated Mechanical Plumbing Electrical (MPE) work. 
INVITATION TO BIDDERS: (MS Word 2003) 11KH-110A
CONTACT: gleong1@bart.gov

 

CONTRACT NUMBER:  01RQ-190
TITLE: Construction of Hayward Maintenance Complex Project Turntable Relocation
PRE-BID MEETING/SITE INSPECTION:  April 21, 2017
BIDS DUE DATE: June 13, 2017
ESTIMATED COST: $4,100,000 to $4,400,000
SUMMARY OF SCOPE: Grading, removal of existing pavement, tracks, appurtenances and turntable, construction of new pavement, tracks and a new turntable with approach slabs. Work will be performed within the railroad operating envelope. Phasing of the work will allow uninterrupted functioning of the Hayward Maintenance Complex and existing turntable.  
INVITATION TO BIDDERS: (MS Word 2003) 01RQ-190, Addendum
CONTACT: sgunawa@bart.gov

 

CONTRACT NUMBER:  15TH-120
TITLE: Water Intrusion Repair at Train Control Rooms
PRE-BID MEETING/SITE INSPECTION:  May 16, 2017
BIDS DUE DATE: June 13, 2017
ESTIMATED COST: $780,000 to $830,000
SUMMARY OF SCOPE: Furnishing all labor, equipment, materials and services required to remove and replace roofing at Daly City Station, Fruitvale Station, and San Leandro Station train control rooms and install a waterproofing membrane in the trackway over the Daly City train control room.
INVITATION TO BIDDERS: (MS Word 2003) 15TH-120
CONTACT: LberryL@bart.gov

 

CONTRACT NUMBER:  09EK-130A
TITLE: Oakland Emergency Generator (OEG) System
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): June 12, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: June 26, 2017
REQUEST FOR 3RD PARTY NON-DISCLOSURE AGREEMENT: June 12, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: July 10, 2017
PRE-BID MEETING/SITE INSPECTION:  TBD
BIDS DUE DATE: September 12, 2017
ESTIMATED COST: $19,000,000 to $22,000,000
SUMMARY OF SCOPE:  Provide all labor, material, equipment, management, coordination to provide a 4.16kV, 2.5MW emergency generator system along with associated 4160V switchgear and 480V switchgear/switchboard lineup along with the required transformers grounding, and improvements to mechanical and civil/structural facilities such as deep soil ground improvements and structural pipe piles or deep soil mix ground improvement including automated monitoring and controls systems to operate the generator and the electrical system as well as infrastructure for utility power to site. The project shall provide power for all emergency loads such as ventilation fans, fire pumps, drain pumps, lighting and other necessary loads during an emergency condition when existing utility power is not available. The work will include communication systems needed for BART interface (such as CCTV, SCADA, ACP, FAT and systems integration).
INVITATION TO BIDDERS: (MS Word 2003) 09EK-130A
CONTACT: sgunawa@bart.gov


Materials, Equipment and Supplies (Procurement)

 

CONTRACT NUMBER:  49GH-110
TITLE: RFQ/P for the Design Build of A Communications Based Train Control (CBTC) System
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): April 11, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: May 23, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: November 7, 2017
PRE-SUBMITTAL CONFERENCE:   TBD in July 2017
QUALIFICATIONS DUE DATE: August 15, 2017
ESTIMATED COST: $500,000,000 to $625,000,000
SUMMARY OF SCOPE:  The Design-Build Contract Work consists of furnishing all management and technical services including coordination, professional services, labor, equipment, materials, safety certification, training, spare parts, and other services to perform the design, manufacture, installation, testing and commissioning and handover of the turnkey communications based train control system for BART. The Work includes related vehicle, wayside, communications and Automated Train Supervision (ATS) systems work.
INVITATION TO PROPOSE: (MS Word 2003) 49GH-110, Attachment 1, Attachment 2, W-9 , Addendum #1
CONTACT: igray@bart.gov