BART has a new procurement portal. All existing and prospective bidders, proposers, vendors, contractors and suppliers must register in the new system to review active solicitations.  Download the solicitation on the new site to become a plan holder.  Plan holders will receive notifications from the system related to that Solicitation. To receive notifications for all upcoming solicitations you will also need to add your email address here.


Measure RR Project Support Leases and Rentals
Summary: Notification
Apply to Participate: Questionnaire
Contact: RRSupport@bart.gov


Professional and Other Services (Services)

 

NONE TO REPORT


Public Works Contracts (Construction)

 

CONTRACT NUMBER:  15IF-140 
TITLE: Powell Street Station Modernization Project
PRE-BID MEETING/FIRST SITE INSPECTION:  August 5, 2019
BIDS DUE DATE: September 24, 2019
ESTIMATED COST: $15 million to $18 million
SUMMARY OF SCOPE:  Provide various upgrades in the Powell Street Station for accessibility and passenger flow.  This includes demolition of the break room at Hallidie Plaza, relocation of the ticket vending machines, adding/redistributing TVM/AFC machines throughout the two ticketing areas, including installation of new conduits wired and fiber, adding/relocating fare gates, service gates, and adding new 5’ fare barriers at the two paid areas.  Relocation of art tiles and installation of new ceiling art lightbox.  Asbestos abatement of existing beams and columns, application of new fireproofing and column cladding.  New platform and trackway lighting, accessing conduit throughout SFMTA platform above. Optional work, such as construction of an ADA accessible ramp in Hallidie Plaza, and removal and replacement of the platform tiles, plus benches, may be included, at the discretion of the District, subject to available funding.
INVITATION TO BIDDERS: 15IF-140, Addendum#4
CONTACT: apalmqu@bart.gov 

 

CONTRACT NUMBER: 54RR-610
TITLE: Systemwide HVAC Upgrades
PRE-BID MEETING/FIRST SITE INSPECTION: August 27, 2019
BIDS DUE DATE: September 24, 2019
ESTIMATED COST: $5 million to $6 million
SUMMARY OF SCOPE: The Work includes: Systemwide HVAC Upgrades as outlined in Contract Specifications Section 01 11 00: a.The mechanical work includes upgrading HVAC equipment with new control, piping, and ductwork. b.Structural work includes seismic support for the new equipment and structural reinforcement for new duct penetration opening. c.Architectural work includes equipment enclosure at Rockridge station, guard rail at roof, roof access ladder, and reroofing at Lafayette station. d.Exterior louver replacement at Concord Station. Patch repair of finishes, replacement battery room doors, cleaning and sealing for maintaining fire assemblies and water proofing. e.Electrical work includes providing electrical connection to new equipment and relocation/installing new lighting fixtures at locations affected by new equipment.
INVITATION TO BIDDERS: 54RR-610
CONTACT:  eelking@bart.gov

 

CONTRACT NUMBER: 54RR-110
TITLE: Sewage Pumps Replacement Project
PRE-BID MEETING/FIRST SITE INSPECTION: August 28, 2019
BIDS DUE DATE: October 01, 2019
ESTIMATED COST: $8 million to $9 million
SUMMARY OF SCOPE: Replacement of sewage pumps plus control systems at twenty-four (24) various locations throughout the District
INVITATION TO BIDDERS: 54RR-110
CONTACT: chorton@bart.gov

 

CONTRACT NUMBER: 04SF-190
TITLE: Antioch Station Expansion Parking Project and Miscellaneous Site Improvements
PRE-BID MEETING/FIRST SITE INSPECTION: September 3, 2019
BIDS DUE DATE: October 01, 2019
ESTIMATED COST: $10,900,000.00 to $12,800,000.00
SUMMARY OF SCOPE: The Work included in this Contract consists of the following work within the existing BART systems. At the New Antioch Station Expansion Parking Lot work includes, but is not limited to, civil site work, grading and drainage, traffic control, clearing and grubbing, asphalt paving and striping, concrete work, landscaping, site lighting, closed caption television cameras, and emergency phone stations. At the Existing Antioch Station Parking Lot work includes, but is not limited to, civil site work, traffic control, site demolition, pavement markings, relocation of existing electronic bike lockers, concrete work including concrete sidewalk, and curb and gutter; asphalt paving and pavement markings. At Canal Road – BART MOW Access Gates work includes, but is not limited to, removal of existing chain link gates, demolition of fence/gate post and foundations, construction of chain link gates, and post foundations; motorized gate openers including access pedestals/controllers and vehicle loop detection. For Option 1 - Slatten Ranch Road Interchange Striping Modifications and Multi-Use Path Improvements work includes, but is not limited to, roadway improvements including traffic control, demolition, pavement markings and obliteration, concrete site work, curb and gutter, pedestrian curb ramps, concrete bike ramps; asphalt paving, pavement marking and striping, and signage; new traffic signals and conduit; landscaping including irrigation and controls; and chain link fencing.
INVITATION TO BIDDERS: 04SF-190, Notice of Advertisement 
CONTACT: dbui@bart.gov  

 

CONTRACT NUMBER: 04SF-210
TITLE: Construction of East Contra Costa BART Extension Project Maintenance Facility Canopies and Structures
PRE-BID MEETING/FIRST SITE INSPECTION: September 11, 2019
BIDS DUE DATE: October 08, 2019
ESTIMATED COST: $600,000.00 to $815,000.00
SUMMARY OF SCOPE: The Work included in this Contract consists of the following within the eBART Maintenance Facility:
1.Canopies: This Work consists of the steel fabrication and installation of canopies over the existing above ground fuel tanks and the existing train washer controls, above ground tanks, and appurtenances within the active maintenance facility. Work includes concrete footing installation, steel structure erection over existing facilities, temporary fencing; and all associated Work as indicated. 2.Structures (Prefabricated “Rhino” Building): This Work consists of clearing and grubbing, civil site work including concrete building slab, concrete paving, and slurry seal; water line utility extension and rearrangement; erection and finishing of an owner furnished prefabricated structure (60’W x 40’L), including interior and exterior lighting, electrical and communication distribution, electrical panels and transformer installation; and all associated Work as indicated.3.Structures (Maintenance Facility Electrical Room and Existing Trailer Offices): This work consists of electrical panel improvements, electrical and communications service distribution, communications equipment installation, fiber installation; and all associated Work as indicated.
INVITATION TO BIDDERS: 04SF-210
CONTACT: chorton@bart.gov 

 

CONTRACT NUMBER: 54RR-270
TITLE: Richmond Yard Fire Protection
PRE-BID MEETING/FIRST SITE INSPECTION: September 12, 2019
BIDS DUE DATE: October 8, 2019
ESTIMATED COST: $2 million to $3 million
SUMMARY OF SCOPE: Replacement of fire mains and hydrant system, including domestic water distribution, flow monitoring/alarm equipment, valves, buried pipe and coupling system, thrust blocking, isolation valves, fire hose valves, communication and low-voltage wiring, and associated conduits at the Richmond Yard ("ORY"). Additionally, provide selective sewer lining and industrial waste pipe replacement.
INVITATION TO BIDDERS: 54RR-270
CONTACT: chorton@bart.gov

 

CONTRACT NUMBER: 54RR-150
TITLE: Backflow Preventer Replacement
PRE-BID MEETING/SITE INSPECTION: September 17, 2019
BIDS DUE DATE:  October 15, 2019
ESTIMATED COST: $800,000 to $1,000,000
SUMMARY OF SCOPE: Isolation and removal of existing backflow preventers. Relocate backflow preventers at OKV above grade and include protective bollards and install protective backflow preventer cage at C80.
INVITATION TO BIDDERS: 54RR-150, Addendum No. 1
CONTACT: ecarter@bart.gov

 

CONTRACT NUMBER: 15II-120A
TITLE: Station Emergency Lighting
PRE-PROPOSAL MEETING/FIRST SITE INSPECTION: September 17, 2019
PROPOSAL DUE DATE: October 15, 2019
ESTIMATED COST: $11,000,000 to $14,000,000
SUMMARY OF SCOPE: The work in general, consist of providing all labor, equipment, material and services to install all necessary appurtenances for installation and connection of a complete Central Emergency Lighting System consisting of one-third of existing lighting in dedicated conduit systems as Indicated.  The work includes, but is not limited to, providing and installing battery room ventilation systems, batteries and corresponding battery racks, Uninterruptible Power Supplies (“USP”) and corresponding Maintenance Bypass cabinets (“MBC”), eye wash stations, circuit breakers, distribution panels, DC battery disconnect switches, unction boxes, pull boxes, conduits, wires, cables, wire fittings, asbestos abatements and accessories required to complete the installation.  The Work also includes, but not be limited to, installation, wirings, labeling and commissioning of the Central Emergency Lighting System; power to all emergency exit signs, lighting calculations for all stations; training for BART personnel; electrical studies; remote monitoring systems in electrical room, train control room, including conduit, wiring and fiber optics where needed between the rooms as indicated; and As-Built drawings.
INVITATION TO PROPOSERS: 15II-120A, Invitation to Bid
CONTACT: gabdull@bart.gov

 

CONTRACT NUMBER: 15EI-181
TITLE: WILLOW PASS ROAD HIGH VOLTAGE SUBSTATION (CWS) TRANSFORMER REPLACEMENT PROJECT
PRE-BID MEETING: September 24, 2019
BIDS DUE DATE: October 15, 2019
ESTIMATED COST: $4.6 million to $5.2 million 
SUMMARY OF SCOPE:  Providing all labor, materials, accessories, and incidental necessary for the final design, fabrication, manufacture, assembly delivery construction, testing, commissioning, and technical support for the replacement of existing 115/34/5KV; 15/20/25 MVA transformer, with new 115/34.5KV; 27/36/45MVA transformer with LTC and associated equipments, as detailed herein and elsewhere in the Contract documents.  The work of this Contract is to demolish existing equipment and prepare sites for installation of new equipment, procure, install, and test new equipment.  The Contract will also provide interfacing equipment at adjacent facilities as described above.  The Contract includes one (1) additional 115/34KVA transformer to be delivered and turned over to the District (BART).
INVITATION TO BIDDERS:15EI-181
CONTACT: apalmqu@bart.gov  

 

CONTRACT NUMBER: 11FE-110
TITLE: Construction of Embarcadero Station Platform Elevator Capacity and Redundancy Project
PRE-BID MEETING: October 2, 2019
BIDS DUE DATE: October 29, 2019
ESTIMATED COST: $7.5 million to $7.9 million
SUMMARY OF SCOPE:  Embarcadero Station: Work at this location consists of construction of a traction elevator and elevator machine room including elevator pit walls and shaft construction and stairs at the north side of the station; renovation of the existing hydraulic elevator including construction of a new elevator machine room; a stair at the south side of the station, and mechanical, electrical, communications, architectural finishes, signage, equipment installation, testing, and commissioning, and other work as Indicated. A Bid Option is included to install stairs from the Concourse Level to the MUNI Level.
INVITATION TO BIDDERS:11FE-110Invitation to Bid 
CONTACT: apalmqu@bart.gov

 

CONTRACT NUMBER: 15EK-100
TITLE: Traction Power Facility Replacements C, M, and K Lines
PRE-BID MEETING/FIRST SITE INSPECTION: October 9, 2019
BIDS DUE DATE: November 19, 2019
ESTIMATED COST: $128,650,000.00 to $153,700,000.00 (Total Base Bid + All Options)
SUMMARY OF SCOPE: The Work of this Contract includes, but is not limited to, replacing BART traction power substation (TPSS) and switching station (SWS) facilities on the BART C, M, and K Lines. The work of this contract also includes demolishing existing equipment and preparing sites for installation of new equipment, which is to be procured, installed, and tested. Additionally, the work includes installation of equipment at eight (8) locations where facilities are to be replaced and includes work at adjacent TPSS, gap breaker stations, train control rooms, and electrical rooms adjacent to the facilities being replaced, as described in the Contract Documents. The contract will also provide interfacing equipment at adjacent facilities as described above. The contract includes two (2) option facilities.
INVITATION TO BIDDERS: 15EK-100, Invitation to Bid
CONTACT: dbui@bart.gov

 

CONTRACT NUMBER: 15EK-145 
TITLE: Traction Power Substation Replacement KTE Installation
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: September 25, 2019
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: October 16, 2019
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: October 16, 2019
PRE-BID MEETING/SITE TOUR: TBD
BIDS DUE DATE: January 7, 2020
ESTIMATED COST: $4,800,000 to $5,050,000
SUMMARY OF SCOPE: The work in general, includes furnishing all equipment, tools, required materials, labor, management, coordination, professional services, and any other services required to install and test TPSS equipment and to provide AC Switchgear, AC equipment house and other associated ancillary items as indicated in the Contract Drawings and Contract Specifications. The work is for Replacement of BART traction power substation KTE (TPSS KTE) near the Oakland Transition Structure, located in the City of Oakland. This Work shall include installation of equipment at four (4) locations, all as outlined in the Contract Drawings and Contract Specifications. The major TPSS equipment will be procured and delivered under a separate Procurement Contract No. 15EK-210, awarded to Powell Electrical Systems, Inc. (Powell). The work of this Contract includes coordination with Contract No. 15EK-210, Procurement of Traction Power Substations Phase 1.
INVITATION TO BIDDERS: 15EK-145, Attachment 1, Attachment 2
CONTACT: LberryL@bart.gov

 

 


Materials, Equipment and Supplies (Procurement)

 

CONTRACT NUMBER:  49GH-110
TITLE: RFQ/P for the Design-Build of A Communications Based Train Control (CBTC) System
REQUEST FOR NON-DISCLOSURE AGREEMENT (PRIME): April 11, 2017
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE: May 23, 2017
3RD PARTY NON-DISCLOSURE AGREEMENT DUE DATE: June 12, 2018
PRE-SUBMITTAL CONFERENCE:   September 6, 2017
QUALIFICATIONS STATEMENT DUE DATE: October 17, 2017
ESTIMATED COST: $500,000,000 to $625,000,000
SUMMARY OF SCOPE:  The Design-Build Contract Work consists of furnishing all management and technical services including coordination, professional services, labor, equipment, materials, safety certification, training, spare parts, and other services to perform the design, manufacture, installation, testing and commissioning and handover of the turnkey communications based train control system for BART. The Work includes related vehicle, wayside, communications and Automated Train Supervision (ATS) systems work.
INVITATION TO PROPOSE: (MS Word 2003) 49GH-110, Attachment 1, Attachment 2, W-9, Addendum 1, Prime NDA.pdf, Third Party NDA.pdf, Addendum 2 Invitation to Purpose, Addendum 3, Addendum 13
CONTACT: igray@bart.gov