PUBLIC WORKS CONTRACTS (CONSTRUCTION) | |||||
Contract Number | Title | Int. Projected Advertisement | Rev. Projected Advertisement | Contact | Est. Value |
03QJ-110A | Concord Yard Wheel Truing Facility | Dec 2023 | Jan 2025 | $37M | |
17HM-110 | Met-G Generator Replacement | Aug 2024 | Dec 2024 | $9M - $10M | |
15TC-206 | Custom Fabricated Material Procurement for EBay Street Level Vent Grates | Oct 2024 | Nov 2024 | $5M | |
17BY-110A | LMA UPS System Installation | Dec 2024 | - | $13M |
Future Construction Contracts Through 2025
*DISCLAIMER: The information provided below is preliminary and subject to change. Bidders shall not rely on this information below in preparing any bid submittals. Information provided cannot be relied upon for activities including but not limited to design, construction, and construction management purposes. The District will not provide any additional information or any inquiries until these contracts are advertised.
Project Name | Contract Description | Estimated Construction Cost |
Millbrae Tail Tracks ‐ Phase 2 | Construction of retaining walls, drainage, etc. in support of extending tail tracks at Millbrae | $7‐$10M |
Station Fire Alarm Replacement‐Phase 4 | Furnish, install, test and commission the station fire alarm replacements at the following locations: El Cerrito Plaza (R40), Bay Fair (A50), South Hayward (A70), Rockridge (C10) and Concord (C60). | $4‐$7M |
Water Intrusion at Train Control Room | Structural repair/restoration to train control room locations at Bay Fair (A50), Walnut Creek (C40), Dublin/Pleasanton (L30), and Richmond (R60) to prevent water ingress. | $3‐$6M |
LMA HVAC Renovation | Replace the 50‐year‐old HVAC system that serves the Lake Merritt (LMA) complex including the Operations Control Center (OCC) and computer rooms. | $10‐$15M |
Control Tower HVAC (OCY, ORY) | Replace and upgrade the HVAC equipment servicing the Concord and Richmond Yard control towers. | $1‐$5M |
Replace Sewage Pumps | Replace sewage pumps at 4 locations. | $1‐$3M |
Embarcadero Platform Elevator | Work at Embarcadero Station consists of the renovation of the existing hydraulic elevator, with a new elevator machine room and new stair at the south side of the station. | $10‐$15M |
TBT Tunnel Lighting Replacement Phase 2- (ON HOLD - DESIGN- 02-01-2022) | Upgrade and installation of new tunnel lighting fixtures in Transbay Tube. | TBD |
TP Core Capacity Project East Bay (RPA, KTF, CMR, AHM) (On Hold) | Design, procure and install three new substations - in Concord, Oakland and Richmond (CMR, KTF, RPA). | TBD |
Re-Roof Facilities Buildings Systemwide | Replacing facility roofs on a priority basis to maintain state of good repair system-wide. | TBD |
Washington Ave Steel Bridge | Repair the Washington Ave steel bridge based on the inspection performed in the previous biennial bridge inspection. | TBD |
MUX Cable Replacement | Procure new cable that handles and allows simultaneous transmission of several messages and signals through a network of cable connections between the wayside train control MUX cabinets to its matching Train Control Room MUX equipment. | TBD |
Dublin/Pleasanton Stn Access Improvement | Project will improve bicycle and pedestrian access to the Dublin/Pleasanton BART station by closing a gap between two existing segments of the Iron Horse Trail in Dublin (to the north) and in Pleasanton (to the south) and includes a two-way cycle track and a separated paved pedestrian path. | TBD |
Pitts BayPt Mobility Improvement | Improve pedestrian and bicycle access to Pittsburg/Bay Point station by adding new cycle-track on access road to Bailey Rd. | TBD |
North Berkeley Machine Room Access Improvement | This project is to create a new door to access the room that can be accessed from the station platform where patrons wait for the train. | TBD |
34.5 KV AC Cable Replacement - K Line | Replace the existing 34.5kVAC cables (PIPE or PILC) on the K-Line with new ethylene propylene-rubber (EPR) jacketed medium voltage cable, fiber optic systems and install isolation disconnect switches at the substations. | TBD |
MATERIALS, EQUIPMENT & SUPPLIES | ||||
IFB Number | Title | Int. Projected Advertisement | Contact | Est. Value |
IFB 9142 | Compact Crawler Boom Aerial Lift | TBD | $700K | |
IFB 9143 | Axle Bearings Procurement | TBD | $1‐$5M | |
IFB 9144 | Ph. III Mobile Genset Procurement | TBD | $475K |
PROFESSIONAL AND OTHER SERVICES (SERVICES) | |||||
Contract Number | Title | Int. Projected Advertisement | Rev.Projected Advertisement | Contact | Est. Value |
6M4874-77 | Independent Medical Examinations | TBD | TBD | $1.5M | |
6M5219 | A Disparity Study for the District's DBE Program | Nov 2024 | Nov 2024 | $500k | |
6M3746 | eBART Track Surfacing Services | Nov 2024 | Nov 2024 | $7M | |
6M2113 | Brokerage Services for Owner Controlled Insurance Program (OCIP) | Jan 2025 | TBD | $1.8M | |
6M8215 | Construction Management Services 2025 | TBD | TBD | TBD |
MICRO SMALL BUSINESS ENTITY (MSBE) SET-ASIDE CONTRACTS/AGREEMENTS | |||||
Contract Number | Title | Int. Projected Advertisement | Rev. Projected Advertisement | Contact | Est. Value |