The BART Procurement Portal for bids will be unavailable due to a scheduled system upgrade beginning Thursday, October 17, at 3:00 PM through Monday, October 20, at 9:00 AM. During this period, the portal will be unavailable, and users will not be able to access or download solicitations. We encourage all vendors and users to plan accordingly to avoid disruption. This advance notice is being provided so you have ample time to prepare. We appreciate your understanding as we work to improve the portal and enhance your user experience. For Procurement support, please contact [email protected].
PUBLIC WORKS CONTRACTS (CONSTRUCTION) | ||||
Contract Number | Title | Projected Advertisement | Contact | Est. Value |
03QJ-110A | Concord Yard Wheel Truing Facility | TBD | $37M | |
17HM-110 | Met-G Generator Replacement | Sep 2025 | $9M - $10M | |
15CQ-211B | Procurement of Direct Fixation Fastener Assembly | Sep 2025 | $2.5M - $3M | |
15EK-103 | TCCCP New Traction Power Facilities, EastBay | Sep 2025 | $116M | |
15TC-121 | MW-12 Slope Stabilization | Oct 2025 | $7M | |
59CT-140 | Wayfinding Improvements Phase 4.1 at North Berkeley, Rockridge, and Fruitvale Stations | Oct 2025 | $3.8M - $4.1M |
Future Construction Contracts Through 2026
*DISCLAIMER: The information provided below is preliminary and subject to change. Bidders shall not rely on this information below in preparing any bid submittals. Information provided cannot be relied upon for activities including but not limited to design, construction, and construction management purposes. The District will not provide any additional information or any inquiries until these contracts are advertised.
Project Name | Contract Description | Estimated Construction Cost |
Millbrae Tail Tracks ‐ Phase 2 | Construction of retaining walls, drainage, etc. in support of extending tail tracks at Millbrae | $7‐$10M |
Station Fire Alarm Replacement‐Phase 4 | Furnish, install, test and commission the station fire alarm replacements at the various station locations. | $4‐$7M |
Water Intrusion at Train Control Room | Structural repair/restoration to train control room locations. | $3‐$6M |
LMA HVAC Renovation | Replace the 50‐year‐old HVAC system that serves the Lake Merritt (LMA) complex including the Operations Control Center (OCC) and computer rooms. | $10‐$15M |
Control Tower HVAC (OCY, ORY) | Replace and upgrade the HVAC equipment servicing the Concord and Richmond Yard control towers. | $1‐$5M |
Replace Sewage Pumps | Replace sewage pumps at various locations. | $1‐$3M |
Embarcadero Platform Elevator | Work at Embarcadero Station consists but is not limited to the renovation of the existing hydraulic elevator, with a new elevator machine room and new stair at the south side of the station. | $10‐$15M |
TBT Tunnel Lighting Replacement Phase 2- (ON HOLD - DESIGN- 02-01-2022) | Upgrade and installation of new tunnel lighting fixtures in Transbay Tube. | TBD |
Re-Roof Facilities Buildings Systemwide | Replacing facility roofs on a priority basis to maintain state of good repair system-wide. | TBD |
Washington Ave Steel Bridge | Repair the Washington Ave steel bridge based on the inspection performed in the previous biennial bridge inspection. | TBD |
MUX Cable Replacement | Procure new cable that handles and allows simultaneous transmission of several messages and signals through a network of cable connections between the wayside train control MUX cabinets to its matching Train Control Room MUX equipment. | TBD |
Dublin/Pleasanton Stn Access Improvement | Project will improve bicycle and pedestrian access to the Dublin/Pleasanton BART station. | TBD |
Pitts BayPt Mobility Improvement | Improve pedestrian and bicycle access to Pittsburg/Bay Point station. | TBD |
North Berkeley Machine Room Access Improvement | This project is to create a new door to access the room that can be accessed from the station platform. | TBD |
34.5 KV AC Cable Replacement - K Line | Replace the existing 34.5kVAC cables (PIPE or PILC) on the K-Line with new ethylene propylene-rubber (EPR) jacketed medium voltage cable, fiber optic systems and install isolation disconnect switches at the substations. | TBD |
Powell Street Elevator | Design and construction of a new elevator at Powell Street Station allowing access to both MUNI and BART platforms. | TBD |
Fencing Replacement | Design and construction of the fences at bridge abutments, yard, and BART right of way | TBD |
Fire Suppression System | Remove and replace all fire sprinkler heads at 11 stations | TBD |
MATERIALS, EQUIPMENT & SUPPLIES | ||||
IFB Number | Title | Projected Advertisement | Contact | Est. Value |
IFB 9142 | Compact Crawler Boom Aerial Lift | TBD | $700K |
PROFESSIONAL AND OTHER SERVICES (SERVICES) | ||||
Contract Number | Title | Projected Advertisement | Contact | Est. Value |
6M8215 | Construction Management Services 2025 | Nov 2025 | $135M | |
6M3773 | Lighting LED Station Upgrade Services | Sep 2025 | $3.7M |
MICRO SMALL BUSINESS ENTITY (MSBE) SET-ASIDE CONTRACTS/AGREEMENTS | ||||
Contract Number | Title | Projected Advertisement | Contact | Est. Value |