Search

Search Results

Construction on two new driveways at Pleasant Hill Station

The week of March 27, 2006, contractors will begin the installation of two new driveways on Oak Road at the Pleasant Hill BART station. This work will require the following partial road closures: The right lane of Oak Road approaching Wayne Drive will be closed. This lane will be closed for about one week

Temporary bus stop relocation during construction at Richmond Station

Starting July 23 and continuing for approximately 5 weeks, bus stops will be relocated because of construction in the bus intermodal area. All bus lines will still be available; however, AC Transit will be combining both directions of each line at the same stop. For a map outlining the changes, you can

El Cerrito Plaza Station elevators temporarily out of service

From Monday, February 23, through Friday, February 27, crews will be interrupting elevator service at the El Cerrito Plaza BART Station to complete electrical improvements to the elevators. This temporary elevator shutdown will limit access to our train platforms at this station.We will put one elevator out

System Performance

Strategic indicator: Average customer on time performance Goal: Optimize and maintain system performance to provide reliable, safe, cost effective and customer focused service BART is working to improve on-time performance by replacing old equipment and introducing new rail cars. Our long-term target is to

Cell service impacted in some areas due to fire

We’ve learned some AT&T fiber was destroyed in a fire and it is impacting cellphone service while riding BART in some areas. The impact area is from Embarcadero, through the Transbay Tube and parts of the East Bay (through Oakland, Richmond, and the Caldecott BART Tunnel). This is out of BART’s control and is

Walnut Creek Station: Passenger loading north side closed 5/8-5/12

The north side of the Walnut Creek BART passenger loading zone and sidewalk (adjacent to the new residential development) will be closed for construction from Monday 5/8 to Friday 5/12. The south side passenger loading zone and sidewalk will remain open. Drivers entering the station from North California Blvd

Construction to close Coggins Drive near Pleasant Hill Station

Beginning Monday, June 4, 2007, contractors for the Pleasant Hill BART Transit Village will begin road construction and underground utilities work on Coggins Drive near the intersection at Jones Road. Crews installing a new sewer line will close Coggins Drive Mondays through Fridays from 9:00 a.m. to 6:00 p.m

Earthquake safety work to begin inside paid area at Bay Fair Station

As part of our systemwide Earthquake Safety Program, work to strengthen structures at Bay Fair station to better withstand future earthquakes will move inside the paid area at the station in late August 2016. Work areas will be fenced in and you may see large equipment accessing the site such as dump trucks

UPDATE: Union City elevator out of service starting 3/5

UPDATE: New start date is March 5 As part of our ongoing efforts to improve Union City Station, we will need to shut down the only elevator serving southbound trains for thirty (30) days from Saturday, March 5 to approximately Tuesday, April 5. In order to have elevator access to or from southbound trains