Search Results
BART participates in Great California ShakeOut 2023
BART will participate in the Great California ShakeOut earthquake drill Thursday, October 19, 2023 to test our emergency response systems and to help raise public awareness of the importance of having a plan and being prepared.
At 10:19 am, BART staff will trigger our ShakeAlert early warning earthquake system to ensure it is functioning and working correctly. Once triggered, trains will automatically slow down to 27 mph. Then all trains will come to a very brief stop. BART will also make a systemwide public announcement encouraging riders to be prepared for earthquakes. BART will also test our internal communications systems to notify employees and the Operations Control Center will observe earthquake alarms and our train control systems to ensure they are working properly.
ShakeAlert Early Warning Earthquake System
BART is an early adopter of the ShakeAlert system which is connected to seismic stations located throughout Northern California. When the alarm is triggered, the system sends a speed restriction command to trains. This system removes human response time and can even slow trains down before the shaking occurs depending on how far away the quake is centered.
BART Adds Inspections to ShakeAlert Drill
For the first time in recent years, BART is adding simulated damage inspections to its ShakeAlert drill. Shortly after ShakeAlert is triggered Thursday, about 60 engineers will divide into teams and fan out to all 50 stations to conduct structural assessments. The engineers will inspect walkways, support structures, elevators, escalators – anything that could sustain damage in a powerful earthquake. The simulation is designed to identify areas for improvement and to exercise “muscle memory” for BART’s earthquake response.
Emergency Response Plan
BART has an Earthquake Emergency Response Plan and we hold several drills a year to ensure staff is trained and ready to respond. In the event of an earthquake, riders should listen for instructions from BART personnel. Employees are trained to evacuate the public from dangerous areas. Following an earthquake, BART trains are held in place (except for trains in the Transbay Tube and BART Caldecott Tunnel) until it is determined it is safe to move the train to the nearest station where riders will be off-boarded.
Earthquake Safety Tips
Where will you be and what will you do when the next big earthquake hits? Taking time to consider these questions now could help if you ever do find yourself in an earthquake.
LISTEN FOR INSTRUCTIONS
That’s one reason why the first guideline in a BART emergency is to follow instructions from BART personnel. The BART Operations Control Center is in constant communication with trains and Station Agents and is in the best position to manage emergencies and provide direction for the public.
ON A TRAIN
If you’re on a train during an earthquake, Train Operators will follow BART’s established emergency plan and provide you with important information. Sit down or grab a handhold to avoid injury. If an evacuation is necessary, emergency response personnel will coordinate.
IN A STATION
If you’re in a station during an earthquake, back away from the edge of the trackway. If you’re in the station concourse, don’t proceed to the platform. Instead, prepare to evacuate the station under the direction of BART personnel.
TRY TEXTING
No matter where you are, emergency experts recommend using text messaging instead of cell calls to communicate with family and loved ones in an emergency. Cell networks can be overwhelmed if everyone’s trying to call at the same time; text messages can be more efficient.
Earthquake Safety Program
BART has spent the last decade retrofitting vulnerable high traffic portions of the original system to make it safer in a large quake. The Earthquake Safety Program is funded in part by Measure AA, a $980 million general obligation BART bond approved by voters in 2004. The Program focused on upgrading portions of the original system not only for life safety but also to ensure that we can return to operation shortly after a major earthquake.
In December 2016, The BART Board of Directors awarded a $313 million contract to install a steel liner inside the Transbay Tube and the installation of a new water pumping system.
Listen to our podcast (or read the transcript) about our efforts to improve earthquake safety at BART.
Visit Shakeout.org for simple safety steps during earthquakes.
BART Police to carry torch to support Special Olympics athletes
On June 18, 2012, BART Police personnel will carry the Special Olympics “Flame of Hope” in the Law Enforcement Torch Run (LETR). At approximately 10:30 am, BART Police personnel will receive the torch at the Hayward Police Department and will run 3.5 miles to the Castro Valley BART Station. From there, BART
BART Police help with Fruitvale cleanup and Halloween costume drive
Officer Denise Gutierrez and her cleanup partner take a break from picking up litter to pose for the camera On Oct. 15, 2011, BART Police Department staff and BART Board Member Robert Raburn joined a community effort to help spruce up the Fruitvale area. Raburn, around a dozen BPD officers, neighborhood
BART to reduce public impacts from Lafayette track rebuild
The construction team rebuilding a large section of trackway near the Lafayette Station is ahead of schedule and that is allowing BART to lessen the public impact of remaining track work. Workers have been active around-the-clock during two previous shutdown weekends to replace nearly 50-year-old track
New posters on BART trains celebrate LGBT Pride Month
June is LGBT Pride Month -- and BART is helping riders take part in the many events celebrating Pride Month in the Bay Area. LGBT stands for Lesbian/Gay/Bisexual/Transgender; Pride Month is dedicated to inclusion and recognition of diversity in sexual orientation and gender identity. "From around the world
BART running longer trains for the Big Game - Stanford at Cal
BART will run longer trains through Berkeley on Saturday, November 20, for the 113th playing of a classic rivalry known as the Big Game -- the football matchup between the Cal Bears and Stanford Cardinal. The game is scheduled for 12:30 p.m. at Memorial Stadium in Berkeley. Fans can avoid the hassles of
BART Police mourn death of officer killed in plane crash
Officer Craig Wilson Joined BART Police in August 2003 BART Police are wearing mourning bands on their badges as they grieve over the death of one of their own: 36-year-old Officer Craig Wilson. BART Police Chief Gary Gee requested all police staff to wear the bands until after the funeral service of Officer
BART holds massive toy drive benefiting League of Volunteers
The spirit of giving is alive and well at BART this holiday season, where this year’s toy drive again proved wildly successful in helping Bay Area kids receive books and toys. The drive was held between Nov. 30 and Dec. 16, and all items will go to benefit the Newark League of Volunteers (LOV). “The annual
BART no longer reducing speed during heat wave- UPDATE
Sunday 9/3 update: BART will not be reducing speeds anymore. Regular speeds have resumed. As a precaution against potential rail movement, BART will be reducing speeds between noon and 8 p.m. on most outdoor parts of the system for the duration of this regional heat wave. Riders should anticipate travel time
Rep. Garamendi tours BART to see stimulus money in action
$13 million in stimulus means more seating, more trains and more jobs East Bay Congressman John Garamendi (D) toured BART today to see how a new construction project, using $13 million in federal stimulus money, is putting thousands of people to work and will ultimately provide more seating, more trains and