Search

Search Results

Governor rejects "cooling off" period

BART Board of Directors President Thomas M. Blalock is applauding Governor Arnold Schwarzenegger’s statement today regarding BART’s contract negotiations. The Governor issued the following statement: "If requested, the Governor will not entertain a 60-day cooling off period at this time in the BART

Powell Street Station water leak repairs mid-August through January 2015

Beginning in mid-August and continuing through January 2015, crews will be working on the concourse level of Powell Street Station to solve the water leaks. The work will happen in 10 phases. We hope working in phases will minimize the inconvenience to you. Please watch for signs and barricades that will

Holiday service, longer event trains on Labor Day weekend

BART will be busy on Labor Day weekend, providing service during the holiday and getting tens of thousands of Bay Area residents to a number of much anticipated sports and musical events. HOLIDAY SCHEDULE BART will operate on a Sunday schedule on Labor Day, Monday, September 5th. Trains will operate at 20-

Repaving work at Lake Merritt Station

On Monday, July 31, BART will begin to repave parking lots at the Lake Merritt BART Station. Throughout this month-long project, there will be temporary changes to where customers will be able to park. BART is doing the work in two phases. Phase I: Repaving the Lake Merritt surface parking lot for Phase I

Fare increase January 1, 2020

A 5.4% inflation-based fare increase will take effect on January 1, 2020 as part of a program first approved by the BART Board in 2003 and renewed for a second series in 2013. For a short trip like Downtown Berkeley to 19th St./Oakland, the Clipper fare will increase by 10 cents, and a longer trip like

Fare increase January 1, 2020

A 5.4% inflation-based fare increase will take effect on January 1, 2020 as part of a program first approved by the BART Board in 2003 and renewed for a second series in 2013. For a short trip like Downtown Berkeley to 19th St./Oakland, the Clipper fare will increase by 10 cents, and a longer trip like

Earthquake safety work underway at West Oakland Station

Dear Rider: As part of BART's system-wide Earthquake Safety Program, we will begin strengthening structures at the West Oakland Station to withstand future earthquakes. During the project, you can expect construction-related noise and some dust. We will post signs with safety information and to alert you of

Embarcadero Station Elevator to Close for Several Months

Dear Customer: On Monday, May 4, 2009, BART will close the street elevator at Embarcadero Station in order to demolish and replace the structure that houses the elevator entrance on the street level. Unfortunately, we must shut down the elevator for approximately three and one-half months (until August 2009)