Search Results
Review the draft environmental document for the East Bay Greenway
The Alameda County Transportation Commission is proposing to construct a 12-mile long, Class I Multi-Use Path, Class II Bike Lanes, and Class III Bike Routes from 19th Avenue in Oakland to the Hayward BART station. The project would serve the Fruitvale, Coliseum, San Leandro, Bay Fair and Hayward BART
Temporary parking changes at Orinda Station
Beginning Monday, August 7, thirty-six parking spaces at Orinda Station will be temporarily closed for approximately one month as Caltrans works to improve drainage. The spaces are all in the Northeast lot. Caltrans will barricade the specific work areas the night before the work. Directional signs will be
Elevator upgrade project at South Hayward Station
From Monday, November 13 through Wednesday, November 22 BART will be upgrading the equipment in the elevator at South Hayward Station. This work will include replacing buttons in the elevator, installing new hands-free phones, and reconfiguring the way in which riders call for the elevators. Passengers who
Discussion of proposed surveillance technology postponed to Mar. 14
BART gave notice of documents related to surveillance technology on 2/12/19 for an item on the agenda for the Feb. 28, 2019, meeting of the Board of Directors. This item was postponed to the March 14, 2019 meeting, and the reports have been revised. Notice to the Board of Directors (original) Proposed
Modified Saturday Schedule on 2017 Presidents' Day
On Presidents’ Day, Monday, February 20, we will be running a Saturday schedule with some earlier service (before 9am) from Richmond to Daly City--the Red Line (which will provide some earlier trains into downtown Oakland and San Francisco) and longer trains on all lines. To find out when the next train will
Trains run on Sunday schedule July 4th 2017
If you plan on attending the Tuesday, July 4th firework show on the waterfront in San Francisco, BART is a great way to get there and get home. BART will be running on a Sunday schedule (opening at 8am and providing a three route service unlike the five we run on Saturday) but with longer trains and some
Three doors on new train cars to reduce noise, improve reliability, increase capacity
By MELISSA JORDAN BART Senior Web Producer What a difference three doors can make.Of all the thousands of decisions that went into designing BART's new train cars, one -- a change in the number of doors -- may prove one of the most momentous.For 43 years now, riders have known the familiar BART train cars
Fleet of the Future train car model finishes 10-stop tour
The riders spoke and BART listened when designing the new Fleet of the Future train cars. Now the public is invited to experience what the new fleet will look and feel like during an unprecedented outreach effort with 10 events held all over the Bay Area between April 16th and May 9th. The public will get to
Bus Bridge between San Leandro-Bay Fair to end at 3pm on Monday for Warriors
UPDATED: 5/29/2016 *NEW: Regular service will be restored by 3pm on Monday, May 30 for the Warriors game. There will be no bus bridge after 3pm on Monday. The track work between San Leandro and Bay Fair will stop to provide regular service for fans and others. This is the final track closure. The work